Tala, Paphos

Orion Villas

Orion Villas is an exclusive residential development of luxury villas in Tala, Paphos, offering panoramic sea views and a prime location just minutes from the town centre, golf course and beaches.

Delivery date: 2027

"Orion Villas" is an exclusive and unique development featuring four bungalows and six 2-storey houses, each offering unobstructed views of the Pafos and Peyia sea. Nestled in the prestigious area of Tala, this project enjoys a prime location just a 4-minute drive to Pafos town center, the Tala golf course, and the beach.

The modern architectural design harmonizes with the natural surroundings, creating spacious and efficient interiors that enhance both comfort and style.

With the village center only 4 minutes away, "Orion Villas" offers an exceptional balance of convenience and tranquility, making it the perfect choice for those seeking a luxurious retreat or a promising investment opportunity.

Type

Villas

Location

Tala, Paphos

Villas size

191-268 m²

Price rage

€855k - €860k

Status

Under construction

Project Units

Price includes:

Overflow swimming pool
Underfloor heating
Front fence and entrance gate
5 kW solar system
BBQ bench
Intercom
Alarm system
Provision for A/C split units
Electric car charger

Optional extras:

Optional landscaping:
€8,000 + VAT

Price Range:

€855k - €860k

Specifications

  • Overflow swimming pool.
  • Underfloor heating system.
  • Custom-made kitchen with technogranite worktop.
  • Floor-to-ceiling fitted wardrobes in bedrooms.
  • Thermal aluminium windows with double glazing.
  • Branded European sanitary ware.
  • Frameless glass veranda railings.
  • Alarm system, intercom and security cameras.
  • 5 kW photovoltaic solar system.
  • Provision for electric car charger.
https://player.mediadelivery.net/embed/616125/927776a4-5a28-46a8-8bf2-f6db3e15d21e

Located in

Tala, Paphos
Tala Village is a picturesque residential area just 7 km from Paphos Town, offering panoramic sea views, a peaceful natural setting and easy access to Coral Bay Beach, the town centre and Paphos International Airport. Known as one of the most desirable communities in Paphos, Tala combines traditional Cypriot charm with modern convenience.
City Center:
1 km
Airport:
15 km
Golf Courses:
10 km
School:
2 km
Supermarket:
1 km
Sea / Beach:
5 km
Restaurants:
2 km
New Marina:
3 km